East Region to enjoy steady electricity supply

The Minister of Water Resources and Energy during a visit to the East Region on Monday November 11, 2019 assured the population of steady electricity supply.

The promise is part of a solution to several months of persistent blackouts in the towns of Bertoua, Abong Mbang and other parts of the East region
The regular electricity cuts made life difficult for population, especially business people.

Minister Gaston Essomba Eloundou of Water Resources and Energy with ENEO official

As remedy to the prevailing situation, the Minister of Water Resources and Energy, Gaston ELOUNDOU ESSOMBA visited some localities in the East Region to give them good news from the Head of State.

Gaston Essomba Eloundou at Transformer with engineers

He told the people that in the next 24 months the East Region will enjoy uninterrupted electricity supply.

Adding that the President of the Republic instructed that the region be connected to the South – East Interconnection electricity supply project.

The project will take off on November 15, 2019. It is financed by the Exim bank. The Minister called on the population to collaborate with the team in charge of the project for the project to be a success.

Power Transformation plant

The energy supply post will be constructed in Abong Mbang and will produce at least 225 kilovolts to electrify many villages in the East Region.
The population welcomed the iniative.

Natacha Lehmann

Elvis Teke

Journalist, Online Reporter, News Presenter, Programme Anchor, Peace Advocate, Geo-strategist,

Laisser un commentaire

Votre adresse de messagerie ne sera pas publiée. Les champs obligatoires sont indiqués avec *

Ce site utilise Akismet pour réduire les indésirables. En savoir plus sur comment les données de vos commentaires sont utilisées.